Shock towers in.. IRS continued

Couple more updates..

Finally stuff on the front suspension is going in for good. Final prepped everything on the drivers side strut tower, drilled all kinds of holes for plug welds and welded everything in. We will wait until we get the car on a rotisserie to well all the way from top to bottom. With the plug welds ground down, it looks like the pieces were supposed to be there. Just need to weld in the pass side and it will be time to put the k-member in for good. Almost done with the front – hard to believe.


On that note – time to catch up on the back suspension. Finally decided how to do the rear mounts on the IRS. We used one of the 2.5″x1/8″ tubes we have made up for the front mounts, cut one in half and will use the 2 pieces to make up both rear mounts. We lucked out and it looks as though the rear tubes use the same 5″ radius as our bends do. Big thing is the rear mount will still clear the 315’s with stock wheel lips. Just need to go grab some more steel to make up the actual brackets that bolt to the frame as we used a scrap piece for now that was a bit too small. Next we need to make up pockets in the frame for the shocks and clearance for the upper control arms. We’ll be on the ground in no time.



This entry was posted in , . Bookmark: permalink.

Categories

Archives