Have not posted in a while.. but getting lots done behind the scenes.
Have the rear wheel wells, shock mounts and spring mounts completed. Pictures shown is with the car upside down. Not much else to do in this area until final paint goes on. Moving onto the front of the car, the new radiator crossmember is welded in for good, and more or less complete (and also shown upside down. Just need to make up a mount to pick up the hood latch support. Only thing left to do under the car now is bend up the 2 rear brake lines and a fuel line.
Figured since the car will hopefully be up and running soon, it was time to finish up the fuel system. We made a fuel sump up out of stainless using a 2003/2004 Cobra tank as reference. We still need to add the supply tube and air vent, otherwise it is ready to go in the tank.
Once the lines are done, the car will be put back on its suspension, and the powertrain will go in for the last time for a while, as it is time to get thing thing on the road.